What is this exporter’s starting point?
An ISO 9001 certified company that exports almost everything to Europe and has never structured its environmental management. This is a typical case, built from situations met on assignments; it does not describe an identifiable company and contains no real data.
The site is in the Tangier region, in northern Morocco. It injection-moulds technical plastic parts and assembles sub-assemblies for a European industrial customer. The workshops run in shifts; maintenance is partly outsourced. The quality manager carries the ISO 9001:2015 certification alone, and its transition to the 2026 edition must be completed before 30 September 2029.
What the site has: a process map, document control, an internal quality audit programme, energy and water bills, and a contractor that collects its waste. What it lacks: an aspects analysis, a legal register, monitored data and a clear view of its hazardous waste.
What exactly does the European customer ask for, and on what basis?
Two separate things, which do not rest on the same text. The first is a contractual requirement: its revised supplier code asks for an ISO 14001 certificate within a set deadline. The second is an annual environmental data questionnaire: energy, water, waste, incidents, legal compliance, greenhouse gas emissions.
The first week is spent qualifying each request:
Request | Likely basis | What to obtain from the customer |
|---|---|---|
ISO 14001 certificate | Supplier code or contract | The written clause, the deadline, the accepted edition, acceptance of a schedule by milestones |
Energy, water and waste data | Customer’s sustainability reporting or purchasing policy | Format, definitions, period, expected level of evidence |
Greenhouse gas emissions | Customer’s climate targets | Required boundary and accepted method |
Statement of legal compliance | Supplier risk management | What the statement covers and the evidence required |
The European regulatory context helps frame the discussion. The European Commission’s staff working document of 3 July 2026, which accompanies the rules on corporate sustainability reporting, states that the Omnibus I Directive, in force since 18 March 2026, narrows sustainability reporting to companies with more than 1,000 employees and more than EUR 450 million in net turnover. The same document provides that a company with no more than 1,000 employees in the value chain can decline to provide information beyond the EU standard for voluntary use. Directive (EU) 2026/470 defines this “protected undertaking” by two criteria only, no more than 1,000 employees on average and a place in the value chain of a reporting undertaking, with no condition of establishment in the EU.
The standard for voluntary use therefore serves as the baseline for answers; questions that go beyond it are open to discussion. The full framework is on our ESG and CSR page.
Why target ISO 14001:2026 directly?
Because a project launched in early 2027 and certified to the 2015 edition would be certified at the worst possible moment. Under the Global ACI transition document, no initial certification to the 2015 edition is possible after 31 October 2027, and a 2015 certificate obtained before then would need a transition audit before 30 April 2029.
Three decisions follow:
- build the system on ISO 14001:2026, using the structure of the quality system;
- ask the certification body in writing when its accreditation transitions, since it issues accredited ISO 14001:2026 certificates only after that decision;
- group in one audit the initial ISO 14001:2026 certification and the ISO 9001:2026 transition, once the certification body is accredited for both editions.
The customer accepts a schedule by milestones rather than a fixed date, provided it receives progress updates. The key dates are set out in our article on the ISO 14001:2026 transition deadline.
What did the gap analysis reveal?
Legal gaps first, gaps against the standard second. The table sums up typical findings for this kind of site; it is not an exhaustive list. The Moroccan texts cited are Law No. 28-00 on waste management and disposal (loi n° 28-00 relative à la gestion des déchets et à leur élimination), Decree No. 2-07-253 on waste classification and the list of hazardous waste (décret n° 2-07-253 portant classification des déchets et fixant la liste des déchets dangereux) and Law No. 49-17 on environmental assessment (loi n° 49-17 relative à l’évaluation environnementale).
Area | Typical finding | Action taken |
|---|---|---|
Hazardous waste (hydraulic oils, contaminated packaging and rags) | Collector’s licence never checked, no tracking forms | Check of licences, tracking forms, register and annual report to the authorities (Law 28-00, Art. 29, 30, 32 and 37) |
Plastic rejects and purgings | Taken by a scrap dealer, with no traceability | Classification of waste under Decree 2-07-253, written contract |
Chemicals (oils, release agents) | Stored on the floor, without bunding | Bunds, unloading instructions, spill kit |
Energy (presses, compressors, cooling) | Only monthly bills are tracked | Metering plan by main use |
Cooling water and sanitary water | No data beyond the bills | Regular readings, leak detection |
Emergencies | Fire in the plastic raw material store never analysed | Scenario, firewater containment, drill |
Site status | No analysis under environmental assessment law | Documented analysis of the site’s status under Law 49-17 |
Context | Climate change never examined | Reasoned decision under clauses 4.1 and 4.2 |
The joint liability set by Article 34 of Law 28-00, for anyone who hands hazardous waste to an unlicensed party, set the priority: the collector first. For the site’s status, Law 49-17 provides for an environmental audit of existing units that are subject to it and have no acceptability decision (Articles 17 and 19), but its Article 32 makes its entry into force depend on the publication of its implementing texts. The site’s status is therefore checked at the time of the project, against the text then in force.
The method used for the analysis and the register is set out in our guide to the environmental aspects and impacts register.
How do you answer the questionnaire without promising what the plant does not do?
By building a single database, in which every figure has a source, an owner and a frequency. The same database feeds the monitoring of the ISO 14001 system, the management review and the answers to the customer.
Indicator | Source of evidence | Frequency |
|---|---|---|
Electricity consumed | Bills, then sub-metering by use | Monthly |
Fuels | Bills and delivery notes | Monthly |
Water consumed | Bills and meter readings | Monthly |
Hazardous waste by type | Tracking forms and register | At each collection |
Non-hazardous waste and share recovered | Collection notes, recycler’s certificates | Monthly |
Environmental incidents | Incident reports and follow-up | At each event |
Legal compliance | Evaluation of compliance report | As set in the register |
Greenhouse gas emissions | Calculation from energy and fuel data | Annual |
Three rules avoid unpleasant surprises. Distinguish the policy, the action under way and the measured result. Flag estimates as such, with their method. Never tick a box for a practice that does not yet exist: writing “in progress” with a date is better than a “yes” that a customer audit will contradict.
What are the lessons of this case?
That the customer’s request is an opportunity to put the site in order, provided you start with compliance. The lessons we draw from this type of assignment:
- Qualifying the request avoids answering questions that were not asked, or were badly asked.
- The legal review comes before writing procedures.
- The existing quality system provides the structure; the aspects analysis, however, is built on the shop floor.
- A schedule by milestones, kept up to date, reassures the customer more than a date promised too early.
- Figures sent to the customer come out of the system, never from a last-minute estimate.
Have you received a similar request? The points to settle in the first week: