How was this comparison put together?

By reading the two official texts side by side, with no intermediate summary. The “Version 6” column cites the April 2023 scheme; the “Version 7” column cites the May 2026 scheme, checked against the Foundation’s document that shows every change in red, Changes Version 6 and Version 7 – Scheme. A point appears here only if it has been checked in both texts. The others are listed at the end, pending verification.

To understand what each change means on the ground, read our guide to FSSC 22000 Version 7 changes. This comparison is the quick-reference version, useful for a quality manager preparing the upgrade as well as for a buyer reviewing suppliers’ certificates.

What changes in the core and the scope?

The prerequisite programmes, the granularity of categories and a few scope rules. ISO 22000:2018 remains the management system standard in both versions.

Point

Version 6

Version 7

PRPs (Part 2 §2.4)

ISO/TS 22002-x technical specifications and BSI/PAS 221

ISO 22002-x series: ISO 22002-100:2025 plus the sector part

Manufacturing PRPs (C, BIII, K)

ISO/TS 22002-1:2009

ISO 22002-100:2025 + ISO 22002-1:2025

Packaging PRPs (I)

ISO/TS 22002-4:2013

ISO 22002-100:2025 + ISO 22002-4:2025

Transport and storage PRPs (G)

ISO/TS 22002-5:2019

ISO 22002-100:2025 + ISO 22002-5:2025

Retail and wholesale PRPs (FI)

BSI/PAS 221:2013

ISO 22002-100:2025 + ISO 22002-7:2025

ISO 22000:2018 (§2.3)

Standard cited on its own

“Including any amendments issued by ISO”

Sub-subcategories

No table

Table 1.1 (C0-1 to K-2), for auditor competence

Multi-site certification

E, FI, FII, G

BIII, E, FI, FII, G

Wholesale on the main site

No explicit rule

Subcategory FI added to the manufacturing category

Off-site warehouse also storing for a sister company

Separate certification of the warehouse

Category G added to the main site’s certificate

Off-site warehouse storing for third-party customers

Separate certification of the warehouse

Outside the main site’s scope; separate G certification possible

Off-site storage included in the audit

Same entity, same system

Same entity, same system, same country

Accreditation framework

IAF MLA

Global ACI MRA

The detail of the PRPs, category by category and for a Moroccan plant, is in our article on ISO 22002-100:2025 and the sector PRPs.

What changes in the additional requirements?

Thirteen headings of section 2.5 carry a change, of substance or of reference; five stay the same in substance.

Heading

Version 6

Version 7

2.5.1 a Laboratories

Analyses for safety verification or validation; reference to ISO 17025

Analyses of critical parameters, performed in accordance with the applicable requirements of ISO/IEC 17025

2.5.1 b and d Purchasing, specifications

C, D, I, FII, G, K

BIII added; specifications based on scientific principles where there is no legislation

2.5.2 d Printing

Category I only

Any site that prints labels or packaging

2.5.3 Food defence

Threat assessment and plan described by FSSC

On top of ISO 22002-100:2025 clause 16.2; competent personnel

2.5.4 Food fraud

Vulnerability assessment and plan described by FSSC

On top of ISO 22002-100:2025 clause 16.3; competent personnel

2.5.6 h Allergens

“Not applicable” possible in category D

Extended to pet food

2.5.8 Culture

Objectives, four elements, plan, management review

Plus: sufficient resources, demonstrable commitment from all personnel

2.5.10 Transport and storage

Requirement specific to FI (BSI/PAS 221 clause 9.3)

Removed; references updated (ISO 22002-100 clause 11.1)

2.5.11 Hazard control

References to ISO/TS 22002-1 and -6

References to ISO 22002-1:2025 and ISO 22002-6:2025, clause 12

2.5.12 PRP verification

BIII, C, D, G, I, K

BIII, C, D, E, FI, G, I, K

2.5.13 Design

Shelf-life testing for all categories covered

Testing limited to BIII, C, D, K; new g) packaging design

2.5.14

Personnel health status (D)

Carcass traceability (C0)

2.5.16 Food loss and waste

Policy and objectives

Objectives with measurable targets and deadlines

2.5.18 Multi-site

E, F, G

BIII, E, F, G; internal auditor training on ISO 22002-x

The same in substance: 2.5.5 (logo), 2.5.7 (environmental monitoring), 2.5.9 (quality control), 2.5.15 (equipment) and 2.5.17 (informing the certification body within 3 working days). The culture change in v7 is detailed in our article on FSSC 22000 food safety culture.

What changes in audit duration and the cycle?

The duration formula and several cycle rules that v6 left implicit. FTE stands for full-time equivalents.

Point

Version 6

Version 7

FSSC time, fewer than 100 FTE, no more than 2 HACCP studies

1 day

0.5 day

Reduction of the base duration

Up to 0.25 day

Prohibited

Small-site exemption

Simple process, fewer than 20 FTE, 1 HACCP study

Fewer than 20 FTE, no more than 2 HACCP studies, all categories

Minimum duration

2 days

1.5, 2 or 2.5 days; at least 2 days in C, D, K

Rounding

Half day

Quarter day

Skipping an audit in the cycle

No explicit rule

Prohibited

Recertification more than 6 months before expiry

No rule

New 3-year cycle, current certificate shortened

Relocation

At least a Stage 2 at the new site

Withdrawal within 3 working days once activity stops; Stage 2 within 6 months

Blackout days (unannounced)

“May” be agreed

“Shall” be agreed

Unannounced audit with no production

No rule

Audit rescheduled

Full remote audits

After a serious event

Same, never more than two in a row

Certificate

Decision, initial certification, issue and expiry dates

Plus: effective date, dates of the last unannounced audit, new decision after an unannounced audit

Technical review

Required

Written procedure mandatory

Translated report

English, or the audit language by agreement; translations checked by the certification body

Same, under the translation rules set by the Foundation

The consequences for your quote are analysed in our article on FSSC 22000 v7 audit duration.

What changes for auditors and certification bodies?

Qualification becomes stricter and more specialised.

Point

Version 6

Version 7

Consultancy experience accepted

Food safety or quality, 6 months at most

Food safety only, 6 months at most

Lead auditor course

40 hours, FSMS or QMS

40 hours, recognised by a competent body (CQI/IRCA, for example), covering ISO 19011 and ISO/IEC 17021-1

PRP training

3 hours per PRP standard

3 hours on ISO 22002-100 and the relevant parts

Further training (3.5.1 g)

Accreditation requirements (ISO 22003-1, ISO/IEC 17021-1)

Mandatory Foundation training, harmonisation included

Approval

By the certification body

Profile pre-approved by the Foundation

Competence

By subcategory, with subdivisions set by each certification body for the broadest ones (CIV, I)

By subcategory and sub-subcategory defined by the Foundation; assessed at every extension

Artificial intelligence

No rule

Mandatory governance framework if the certification body uses AI (Part 3 §9)

Accreditation bodies’ witness audits

FSSC 22000 audits

Same; audits against another scheme and simulated audits excluded

Annex 2 adds two reporting rules. A PRP nonconformity is raised against the clause of ISO 22002-100, unless it concerns a requirement specific to the sector part. Several deviations against the same requirement form a single nonconformity, assessed to decide whether it is a systemic issue. The report must also confirm the climate change analysis in the context of the management system.

What does not change between v6 and v7?

The nonconformity regime and the backbone of the cycle. That is good news: your nonconformity handling procedures remain valid.

Rule

Both versions

Nonconformity grades

Minor, major, critical; no “opportunities for improvement”

Minor

Action plan approved by the certification body within 28 calendar days

Major

Closed within 28 calendar days, otherwise suspension

Critical

Suspension within 3 working days; response within 14 days; follow-up audit between 6 weeks and 6 months

Cycle

3 years, two annual surveillance audits, first surveillance within 12 months

Unannounced audit

At least one surveillance audit per 3-year period; never the initial audit

Time on the shop floor

At least 50% of audit duration

Interpreter

At least 20% more time

Auditor rotation

No more than two 3-year cycles at the same site

Which points remain to be checked?

Those that are still moving or depend on paid texts. Keep them on your watch list until the upgrade.

To turn this comparison into an action plan, follow our FSSC 22000 v6 to v7 upgrade plan.